Plan for treatment technology assessment

The guiding documents for Pit management require ongoing assessment and evaluation of the Horseshoe Bend Water Treatment Plant and the technology used to treat contaminated Pit water until several years prior to full-scale implementation. That implementation is required when water levels at any monitoring compliance point reach the Critical Level of 5,410 feet above sea level. A review of treatment […]

Read More...

In 2010 EPA interviewed local citizens and reviewed the status of Butte area Superfund sites as part of a required five-year review (the full review report is available here). Five-year reviews determine whether remedies or other response actions are protective of human health and the environment in compliance with a site’s decision documents. Methods, findings, and conclusions are documented in […]

Read More...

Water from the Horseshoe Bend drainage is diverted before reaching the Pit and treated in the Horseshoe Bend Water Treatment Plant for use in mining operations. In 2012, the plant treated about 5 million gallons of water per day. Sludge from the treatment process was returned to the Pit at a rate of 491,000 gallons per day. No water or […]

Read More...

Set by the U.S. EPA and Montana DEQ, the Critical Water Level, 5,410 feet, marks the point where full-scale pumping and treating of Berkeley Pit water will begin. The level represents the lowest level in the Butte Basin, the stream bottom of Silver Bow Creek. It was set to prevent any contamination from moving into surface and groundwater. The critical […]

Read More...

The Horseshoe Bend Water Treatment Plant can be seen on the northeast edge of the Pit. The plant was constructed in 2002-2003 to fulfill the EPA Record of Decision, which requires that surface water flowing into the Berkeley Pit be captured and either used in the mining process or treated. The Horseshoe Bend Water Treatment Plant, completed in 2003, captures […]